
After that, I worked on the latch to the gate separating the front and back yards. The concrete guys took off the gate to pour the new driveway concrete. When they put it back, the latch would not close correctly. I moved the latch to a new location on the gate. Secured the thing with four little screws. It works like a charm now.
My main chore this day was to deal with some of the erosion in the back yard. I set up a water collector in the ground made of crushed rock. I funneled this to a new PVC pipe in the ground that diverts the water to the bottom of the hill. I reinforced the sides of the pipe with lumber to keep it strong.
No comments:
Post a Comment