
We also needed help in our master bedroom bathroom. The shower head is old and crusty. The wallpaper is coming off the wall here and there. I tried to patch up the wallpaper and it looks bad. The ceiling needs a little repair too. The grout and caulk on the shower tiles needs help.
The last big item is the new shed I want. I founder a vendor. They don't do permits. They do not install on an incline. I want my handman to take care of these problems for me. I hope I can afford him to do all my shed work. This will require a concrete pad to level out the hill. I want a big shed once and for all.
No comments:
Post a Comment