The roofers came really early today. I was ready. They were tearing off the roof by 6:30am. I think by law they are supposed to wait until 7:00am. However since there is a heat wave, I figure they needed to start early.
Luckily I had pre-negotiated that any sheathing plywood would be covered by my roofing estimate. Normally they charge by the 4x8 sheet. It ranges from $50 to $100 a sheet installed. My contract stipulated that the price for any sheathing replacement was covered. Turns out they roofers decided every existing sheet needed to be replaced on my roof. That could have cost me $3000++ extra.
During the removal of the second layer of existing roof, somebody must have slipped and fell through the roof. It punched a whole in Kat Kat's bedroom ceiling. She was disturbed to say the least. The main roofer was apologetic. He came in and cleaned up the mess from the puncture. They he called a guy to come patch the ceiling.
They color matched the ceiling. But the color would not match exactly. It was close enough for us. I did have to run after the contractor because he took the wood/lumber that we used to cover up and brace the whole temporarily. They offered to give me extra plywood that they will be throwing out. No thank you. I just wanted to keep what I started with.
As an aside, I have made a lot of charges this month with the kids bathroom renovation, plus Momoko's niece coming out to visit for the summer. While I am not at my limit yet, paying the balance on the roofing job would push me over the limit. I was able to call up my bank and get them to give me an instant credit increase. Now I hope we should be good (still have a beach trip to pay for later this month).